The Public Administration of Roads of Moldova receives the works carried out by Eptisa

08-Nov-2022


The Public Administration of Roads of Moldova receives the work carried out by Eptisa in the project “Supervision and Management of the construction works of the M3 Porumbrei – Cimi?lia highway and the construction works of the M3 Comrat bypass”.
The length of the Porumbrei – Cimi?lia has been 19 km and that of the Comrat bypass 18 km
The value of the contracts has been more than 30 million euros each.
XML 地图 | Sitemap 地图